Schnitman PA, Wöhrle PS, Rubenstein JE. Immediate fixed interim prosthesis supported by two-stage threaded implants: Methodology and Results. J Oral Implant 1990;16:96-105. [LINK]

Schnitman PA, Wöhrle PS, Rubenstein JE, DaSilva JD, Wang NH. Ten year results for Brånemark implants immediately loaded with fixed prostheses at implant placement. Int J Oral Maxillofac Implants 1997;12:495-503. [LINK]

Rocci A, Martignoni M, Gottlow J. Immediate loading in the maxilla using flapless surgery, implants placed in predetermined positions, and prefabricated provisional restorations: a retrospective 3-year clinical study. Clin Implant Dent Relat Res. 2003;5 Suppl 1:29-36. [LINK]

Van Steenberghe D, Glauser R, Blombaeck U, Andersson M, Schutyser F, Petterson A, Wendelhag I. A computed tomographic scan-derived customized surgical template and fixed prosthesis for flapless surgery and immediate loading of implants in fully edentulous maxillae: a prospective multicenter study. Clin Implant Dent Relat Res. 2005;7 Suppl 1:S111-20. [LINK]

Becker W, Goldstein M, Becker BE, Sennerby L. Minimally invasive flapless implant surgery: a prospective multicenter study. Clin Implant Dent Relat Res. 2005;7 Suppl 1:S21-7. [LINK]

Becker W, Doerr J. Three-dimensional software for fabrication of a surgical template and final implant-supported restoration for a fully edentulous maxilla: a case report. Compend Contin Educ Dent. 2005 Nov;26(11): 802, 804-7. [LINK]

Wöhrle PS, Cornell, DF. Contemporary Maxillary Implant-Supported Full-Arch Restorations Combining Esthetics and Passive Fit. QDT 2008. [PDF]